New railway line design and construction works
Rebuilding of station roads and change of turns
Removal of old track, construction of track bed, installation of track
50 km superstructure replacement, level crossing renovation and automation, switch replacement
Railway tracklining, rail welding and neutralisation
Engineering of the traffic management system of the station, renovation of station railways, installation and automation of switch blades, programming of management software, installation of new signal light, replacement of cables.
Replacement of sleepers, installation of ballast sand, tracklining and ballast tampering
Lelle-Viljandi fibre-optic cable line
Reconstruction of 15 passenger platforms at railway stations across Estonia
2.3 kilometres of new railway in Muuga Harbour