750mm railway track construction

Railway geometry improvement and level crossing renovation

New railway line design and construction works

Rebuilding of station roads and change of turns

Rail replacement, welding, neutralization

Ballast, rail, sleeper replacement works

Rail welding and neutralisation

Tracklining and ballast tampering

Removal of old track, construction of track bed, installation of track

50 km superstructure replacement, level crossing renovation and automation, switch replacement

Railway works, installation, tracklining and welding on bridges

Railway works, installation, tracklining and welding on bridges

Railway works, installation, tracklining and welding on bridges

Railway works, installation, tracklining and welding on bridges

Railway works, installation, tracklining and welding on bridges

Rail welding and neutralisation

Vaasa Ratatyöt

Rail welding and neutralisation on the section between Kilpua and Oululainen.

Rail welding and neutralisation on the section between Vainikkala and Lappenranta.

Rail welding and neutralisation

Rail welding and neutralisation on the section between Imatra and Joutseno.

Rail welding and neutralisation


Rail welding and neutralisation at Laihia station 2017

Railway tracklining, rail welding and neutralisation

Railway tracklining, rail welding and neutralisation

Railway tracklining, rail welding and neutralisation

Tracklining and ballast tampering and railway welding

Engineering of the traffic management system of the station, renovation of station railways, installation and automation of switch blades, programming of management software, installation of new signal light, replacement of cables.

Replacement of sleepers, installation of ballast sand, tracklining and ballast tampering

Lelle-Viljandi fibre-optic cable line

Reconstruction of 15 passenger platforms at railway stations across Estonia

2.3 kilometres of new railway in Muuga Harbour

Major repairs to 52 km of railway